CondoGrid CondoGrid
Ciprés and Rilea Group Top Off The Rider Residences in Wynwood
Project update

Ciprés and Rilea Group Top Off The Rider Residences in Wynwood

Yoann Dorat September 23, 2026 2 min read
/
Click to zoom

Wynwood’s boutique condo pipeline just hit a structural milestone. Ciprés, working with Rilea Group, has topped off The Rider Residences at 94 NE 29th Street — the point where the last slab is poured and the tower turns to facade and interiors — with completion targeted for the second half of 2027. Beauchamp Construction is general contractor.

The 12-story building will deliver 152 fully furnished studios through three-bedrooms and penthouses, with select dens, sized from about 386 to 1,612 square feet and priced from $550,000 to $2.4 million. Spec includes Bertazzoni appliances, Italkraft cabinetry, Cosentino Dekton counters and smart-home systems; Restoration Hardware packages are available on select upper homes. Architecture is by Deforma Studio, with interiors by RADYCA.

Amenities lean lifestyle-forward: rooftop pool and lounge, fitness and wellness spaces with cold plunges, infrared saunas and a Turkish hammam, plus The Leopard Room speakeasy on the ground floor. Owners also get access to a private South of Fifth beach club, motorcycle and bike programs, and roughly 11,000 square feet of ground-floor retail and rooftop F&B. The project allows short-term rentals with optional management through The Rider Living; Cervera Real Estate leads sales.

Sales are past 50 percent, with demand reported from Europe, South America, California and New York. Banco Inbursa provided a $90 million construction loan in 2025. On the same block, Rilea plans to start Mohawk at Wynwood — a 12-story, 300-unit multifamily with retail — signaling a longer-term land play rather than a one-off condo flip.

The Rider
For Sale
Wynwood · Miami 50 images
Project behind this story Contract

The Rider

94 NE 29th St, Miami, FL, 33137

The Rider Residences is a 12-story boutique condominium at 94 NE 29th Street in Miami, offering 146 fully finished residences — from studios to three-bedrooms — in a...

Developer website
Where the project stands ~6 months until keys are released
Coming Soon Proposed Contract Reservation Just Completed Completed

Currently at Contract

146

Residences

12

Stories

$519K

Entry price

S–3

Bedrooms

Development

Rilea Group

Architecture

Deforma Studio

Interiors

RADYCA

CondoGrid outlook Announced handover window
~6 months until keys are released Targeting Q1 2027 High confidence

Taken from the delivery window the development team has put on record, then tracked against construction milestones as they are reported.

Average rate
$1,107 / sq ft
the rider
rilea group
the rider residences
beauchamp construction
italkraft
betazzoni
deforma studio
cervera